a. Scaffold platforms more than ten feet above the ground, floor, or lower level will have standard guardrails (consisting of top rail, mid rail, and toe board) installed on all open sides and ends of platforms . b. Planking will be laid tight, overlap at least 12 inches, and extend over end supports 6 - 12 inches. c. Mobile scaffolds will be erected no more than a maximum height of four times their minimum base dimension. d. Scaffolds will not be overloaded beyond their design loadings. |